History Since the Establishment of JR East

2010s

2019

December

Monthly transactions using transportation IC cards exceeded 250 million

December 9

Started technical verification for the use of NFC tags

November 30

Mutual direct service with SAGAMI RAILWAY Co., Ltd. begins

November 21

STATION DESK Tokyo Marunouchi opened

November 7

JR-EAST HOTEL METS PREMIER TOKYO BAY SHINKIBA opened

November 1

  • Began providing Shinkansen seat availability and train operation information through Google Assistant
  • Shibuya Scramble Square Phase I (East Tower) opened

October 13

Nagano Shinkansen Rolling Stock Center flooded following Typhoon No. 19 (Hagibis)

October 7

JR-EAST HOTEL METS PREMIER AKIHABARA opened

October 3

Launched a test of SMART-i, a maintenance vehicle with Shinkansen monitoring equipment

October 1

  • Began offering JRE POINTs for railway travel using Suica
  • Fares and charges revised in connection with the consumption tax rate increase

September 1

Began sales of the Welcome Suica card

August 1

Launched the in-station shared office business STATION WORK

July 1

  • JR East Service Creation Co., Ltd. commenced operations with the aim of improving the quality and value of the travel experience
  • JR East Start UP Co., Ltd. and Signpost Cooperation established a joint venture, Touch To Go Co., Ltd.

June 21

  • The Tourism Strategy Office was transferred from the General Planning Headquarters to the Sales Department
  • Integrated the Human Resources and Welfare Departments to establish the Human Capital Strategy Department, and merged the Legal and General Affairs Departments to establish the General Affairs & Legal Strategy Department

May

Test runs begin with Series E956 Shinkansen ALFA-X test train

April 20

J-Village Station on the Joban Line opened

April 1

  • JR EAST Technical Intern Training launched
  • Health Management Mid-Term Vision 2023 announced
  • Established Shinkansen General Headquarters

March 23

Restoration work completed on the Yamada Line between Miyako and Kamaishi, and operation transferred to Sanriku Railway Co., Ltd.

March 16

  • New express trains FUJI EXCURSION, Hachiōji and Ōme debuts on Chuo Line
  • Series E7 begins operation on the Jōetsu Shinkansen

February 17

ATOS central system (Tokaido Line & Tokaido Freight Line) upgraded

February 12

JR East, JR Hokkaido, TOKYU RAILWAYS, and JR-FREIGHT jointly announced that they would lend the sightseeing train View Coaster Kazekko to JR Hokkaido

February 1

JR-EAST HOTEL METS PREMIER SAPPORO  opened

January 29

Accessible facilities at Ochanomizu Station begin operation

January 15

Miyako Station interlocking system improved; new CTC system installed at Miyako Control Office

2018

December 29

Yamanote Line Series E235 trains underwent repeated ATO and system tests until April 2019

December 12

Self-driving technical demonstration started on the Ōfunato Line operated by BRT (Bus Rapid Transit System)

November 18

Iwakiri Station elevated station building and free passageway opened

November 16

Jexer Fitness Garden sopra machinoma Omori opened

November 6

Group Safety Plan 2023 announced

October 5

Expanded the Accident History Exhibition Hall

October 1

COTONIOR Musashiurawa opened

September 28

CIAL Kikuna opened

September 27

Concluded a basic agreement with Toyota Motor Corporation for a comprehensive business collaboration centered on hydrogen-based mobility integration between railways and automobiles

September 4

Started providing crime prevention and self-defense equipment on Shinkansen trains, and expanded provision of medical equipment

August 11

SPORU SHINAGAWA OIMACHI opened

August 1

  • Established the Tokyo Metropolitan Area Station City Creation Center
  • Monthly transactions of transportation e-money exceeded 200 million in July
  • Mizuho Suica launched

July 5

Railway Museum South Building opened

July 3

  • Started installing additional security cameras inside trains
  • JR EAST Group Management Vision "Move Up 2027" announced

July 1

Opening of Oga Station as an Ecoste (eco-station)

June 28

  • Perie Chiba Phase III starts
  • Integrated View Thanks Point into the JRE POINT program

June 24

Began temporary use of the free passage at Shin-Koiwa Station

June 22

System Planning and Technology Planning Departments (under General Planning Headquarters) and the Information Business Strategy and ICT Business Promotion Groups (under IT & Suica Business Headquarters) were integrated to establish the new Technology Innovation Promotion Headquarters

June 12

Agreement concluded with Japan Post Co., Ltd. regarding regional and social revitalization

June 1

Monthly transactions of transportation e-money exceeded 180 million in May

May 24

  • Free public Wi-Fi service launched on Shinkansen trains for international visitors to Japan
  • Suica service launched on Google Pay

April 21

COTONIOR GARDEN Shin-Kawasaki opened

April 15

Opening of Niigata Station elevated track Phase 1

April 14

Musako Garden opened at nonowa Musashikoganei

April 1

  • Cotonior Koshigaya Laketown opened
  • COTONIOR GARDEN Shin-Kawasaki opened
  • Expanded JR East child monitoring service Mamorail to 244 stations
  • Launched the Touch de Go! Shinkansen service
  • Ashikaga Flower Park Station on the Ryomo Line opened
  • JR East Retail Net Co., Ltd. merged with JR East Station Retailing Co., Ltd., making JR East Water Business Co., Ltd. a subsidiary

March 31

Established JRE Business Development Taiwan, Inc.

March 26

Online shopping site JRE MALL opened

March 20

Shapo Loco Hirai opened

March 16

  • JR Urawa Station West Exit Building opened, and Urawa Station Nakanoshima Underground Passage begins operation
  • atre Urawa West Area and Jexer Fitness & Spa Urawa opened

February 20

Established a new corporate venture capital company, JR East Start Up Co., Ltd.

February 17

North passage and north ticket gate at Kawasaki Station opened, along with the expanded section of atre Kawasaki

February 9

Shapo Funabashi South Building and JR-EAST HOTEL METS FUNABASHI opened

January 16

Completed the first production pilot of the Series GV-E400, our first electric-diesel hybrid train

January 9

  • Expanded JR East child monitoring service Mamorail to 111 stations
  • Increased investment in Creative Travel and launched a new structure under the new trade name Creative Travel (Taiwan), Ltd.

2017

December 23

New Series E353 limited express begins operation on the Chuo Line

December 19

Operation Control Method Against Wind Gusts Using Doppler Radar

December 18

Hotel Dream Gate Maihama Annex opened

December 17

Kikuna Station elevated station building begins operation

December 10

Commenced franchise operations of the West Midlands Trains Limited in the United Kingdom

December 7

Tōkyō Station Marunouchi Station Square opened

December 5

Integrated Suica Points into the JRE POINT program

December 1

JR EAST Southeast Asia Sales Center opened in Singapore

November 25

LUMINE SINGAPORE opened

November 4

Introduced the wireless train control system ATACS on the Saikyo Line

November 1

Began partial integration of seismic data from the Seafloor Observation Network for Earthquakes and Tsunamis along the Japan Trench into the Shinkansen early earthquake detection system

October 26

Japan International Consultants for Transportation Co., Ltd., as part of a joint venture (JV), was awarded a contract by India’s National High Speed Rail Corporation Limited (NHSRCL) for construction supervision services for a training facility related to the Indian High-Speed Rail project

October 1

JR East launches the child monitoring service Mamorail at 57 stations on the Yamanote Line and Chuo Line (Tokyo-Takao)

September 7

Perie Chiba (station building 2F-7F) Phase II starts

September 5

  • Established the Mobility Revolution Consortium
  • Direct farmers’ market AOYA opened

September 1

Shared office PO-TO opened between Musashi-Sakai and Higashi-Koganei Station

August 30

  • NOMONO Juice Hyakuka Hyakusai Gransta Marunouchi Store opened
  • NOMONO Tōkyō Station Gransta Marunouchi Store opened
  • New areas opened at Gransta Marunouchi and Gransta at Tōkyō Station

August 3

Trial operation of the Akita Port Cruise Train conducted

August 1

Monthly transactions of transportation e-money exceeded 170 million in July

July 25

Beans Asagaya opened

July 3

Opening of Kobuchizawa Station as an Ecoste (eco-station)

July 1

  • Monthly transactions of transportation e-money exceeded 160 million in June
  • JR hotel membership program EASTYLE MEMBERS renamed JR Hotel Members and joined the JR Central Group (six hotels joined by October 2017)

June 23

Consolidated international operations and established a new International Department within the General Planning Division

June 19

  • Agreed with Fukushima Prefecture on the separated operation model for restoring rail service on the Tadami Line (between Aizu-Kawaguchi and Tadami)
  •  HOTEL METROPOLITAN SENDAI EAST opened

June 13

JR Saitama Shintoshin Building and HOTEL METROPOLITAN SAITAMA-SHINTOSHIN opened

June 8

Officially participated in the International Rail Rodeo held in the United States (a competition for train operators and vehicle maintenance teams)

June 1

  • Monthly transactions of transportation e-money exceeded 150 million in May
  • S-PAL Sendai East Building Phase II starts

May 18

Vice Chairman Ogata (at the time) was appointed Honorary President (lifetime) of the International Association of Public Transport (UITP) and Chairman of the Asia-Pacific Division (until June 2019

May 1

TRAIN SUITE SHIKI-SHIMA begins operation

April 17

Opening of Musashi-Mizonokuchi Station as an Ecoste (eco-station)

April 8

  • Opening of Niitsu Station as an Ecoste (eco-station)
  • Musashisakai Poppo Park opened between Musashi-Sakai Station and Higashi-Koganei Station

April 6

JR EAST Startup Program launched

April 1

  • Achieved a total of 100 childcare support facilities under the HAPPY CHILD PROJECT
  • Kōriyamatomita Station on Ban-Etsusai Line opened

March 25

Platform doors installed at Akabane Station on the Keihin-Tohoku Line

March 15

atre Meguro 1-B Building reopened after renovation

March 12

Opening of Urawa Station as an Ecoste (eco-station)

March 4

Series EV-E801 (ACCUM) begins operation on the Oga Line

February 16

JRE POINT service expands to the Tohoku area

February 8

NOMONO Kitchen Miyako opened

January 27

Established JR Agri Sendai Co., Ltd.

2016

December 17

Trial installation of Smart Platform Doors® (covering one train car) at Machida Station on the Yokohama Line

December 15

Train Hostel Hokutosei opened

December 9

Japan International Consultants for Transportation Co., Ltd. receives order from JICA for the "Detailed Design Study on the High Speed Railway Construction Project in India" as a joint venture (JV)

December 4

JAPAN RAIL CAFÉ opened in Singapore

December 1

  • JR Akita Shimohama Wind Power Station begins operation
  • Cotonior Kunitachi opened

November 25

  • LUSCA Atami opened
  • Renovation of Ryōgoku Station completed; Ryogoku Edo Noren opened

November 22

Number of valid ViewCard members exceeds 5 million

November 20

  • New Chiba Station building begins operation
  • Perie Chiba Ekinaka Phase I starts

November 8

Medium-to-Long-Term Vision for Technological Innovation announced

October 25

Suica service launched on Apple Pay

October 7

  • JR East app integrated with the Tokyo Metro and TOKYU RAILWAYS apps
  • JEBL Akihabara Square opened

September 1

Station numbering introduced

August 20

Purple Line of the Mass Rapid Transit Authority of Thailand opened

August 6

Direct operations to Onagawa Station began on select Senseki-Tohoku Line trains

August 4

  • New west-side free passage at Tachikawa Station opened
  • ecute Tachikawa Osoto opened, and ecute Tachikawa reopened after renovation

July 27

Tōkyō Station Gransta Marunouchi opened, and Phase I of the new Gransta area launched

July 15

Suica Point app released

July 11

Certified with the highest Eruboshi (Level 3) rating under the Act on the Promotion of Women's Active Engagement in Professional Life

July 1

Monthly transactions of transportation e-money exceeded 140 million in June

June 27

Started installing parcel delivery lockers at stations

June 10

nonowa Musashisakai EAST opened

June 8

JR East unveils the 2020 Project ahead of the Tokyo 2020 Olympic and Paralympic Games

June 7

Concluded an agreement to become an official partner (passenger rail transport services) of the Tokyo 2020 Olympic and Paralympic Games

April 24

nonowa Kunitachi WEST opened

April 23

Nambu Line revitalization project Kurasu Class opened

April 15

  •  atre Ebisu opened
  • NEWoMAN (Phase II) starts

April 1

Cotonior Nishi Funabashi opened

March 29

  • Reserve fund plan for large-scale Shinkansen railway renovations approved
  • NOMONO original product Oyatsu TIMES goes on sale

March 26

  • Began mutual use of IC cards with Sendai City Transportation Bureau’s icsca in the Sendai area
  • Limited express trains Shiratori and Super Shiratori, express train Hamanasu, and sleeper limited express Cassiopeia were discontinued with the opening of the Hokkaido Shinkansen
  • Ishinomakiayumino Station on the Senseki Line opened
  • Odasakae Station, the first strategic new station on the Nambu Line, opened
  • Hokkaido Shinkansen opened between Shin-Aomori to Shin-Hakodate-Hokuto Station

March 25

JR SHINJUKU MIRAINA TOWER opened and NEWoMAN (Phase I) starts

March 18

S-PAL Sendai East Building opened, and the Sendai Station East-West Free Passage begins operation

March 7

Series E235 begins full-scale operation on the Yamanote Line

March 4

Japan International Consultants for Transportation Co., Ltd. receives order from JICA for consulting services for the "Institutional Development Support Project for High Speed Rail in India"

March 1

Ekiben (station lunch boxes) sold at Gare de Lyon in Paris, France

February 23

JRE POINT service launched

February 11

All Purple Line trains delivered to Bangkok

January 27

Established JR Niigata Farm Co., Ltd.

January 18

NOMONO Izakaya Kayoiji Ueno restaurant opened

2015

December 21

View Gold Lounge service launched

December 17

Tekute Nagamachi opened

December 12

nonowa Musashikoganei WEST opened

December 11

A train derailment occurred between Matsukusa and Hiratsudo Station on the Yamada Line

December 4

View products goes on sale online

November 27

JR EAST Dynamic Rail Pack goes on sale

November 25

atre Urawa opened

November 20

LUSUCA Chigasaki reopened following expansion

November 18

NOMONO Kitchen Ikebukuro East Exit opened

September 30

Sister station agreement concluded between Tōkyō Station and Frankfurt Central Station in Germany

August 24

First Bangkok Purple Line train set completed and shipped from J-TREC Yokohama Plant

August 1

Monthly transactions of transportation e-money exceeded 130 million in July

July 24

Daily transactions of transportation e-money exceeded 5 million

July 7

UIC HIGHSPEED 2015, the 9th world Congress on High Speed Rail

June 11

Vice Chairman Ishida (at the time) assumed the position of Chairman of the International Association of Public Transport (UITP) (until May 2017)

June 1

  • Power Technology Management Center established within the Electrical Network Department
  • Monthly transactions of transportation e-money exceeded 120 million in May

May 30

The Senseki Line was fully restored, and the Senseki-Tohoku Line opened

May 26

Selected by the Ministry of Economy, Trade and Industry (METI) as a Competitive IT Strategy Company

April 30

Application submitted for delisting from the Nagoya Stock Exchange

April 23

Issuance of the View Gold Plus Card and family cards began

April 18

nonowa Kunitachi EAST opened

April 12

Incident involving the collapse of an electric pole between Kanda and Akihabara stations on the Yamanote Line

April 8

Established JR East Energy Development Co., Ltd.

April 5

Opening of Fukushima Station as an Ecoste (eco-station)

April 1

  • Cotonior Akabane opened
  • East Japan Transport Technology Co., Ltd. and Tohoku Rolling Stock Machinery Co., Ltd. merged to establish JR East Rail Car Technology & Maintenance Co., Ltd.

March 29

  • Opening of Yumoto Station as an Ecoste (eco-station)
  • Hotel Folkloro Sanrikukamaishi opened

March 28

Elevating platform doors installed at Haijima Station on the Hachiko Line

March 21

Ishinomaki Line fully restored

March 18

Selected as one of the “Top 100 Companies for Diversity Management” by the Ministry of Economy, Trade and Industry

March 14

  • New seats introduced on the Joban Line Limited Express Hitachi and Tokiwa trains
  • Suica service begins at Fujikyu Railway
  • Suica service begins on the Kesennuma and Ōfunato Line operated by BRT (Bus Rapid Transit System)
  • Tendōminami Station on the Ou Main Line opened
  • Regular service of the sleeper express Hokutosei ends
  • Ueno-Tokyo Line opened
  • Hokuriku Shinkansen opened between Nagano and Kanazawa

March 7

MIDORI Nagano opened

February 19

nonowa Musashikoganei EAST opened

February 12

Sister station agreement concluded between Tōkyō Station and Hsinchu Station in Taiwan

2014

December 20

Tōkyō Station celebrates its 100th anniversary

December 11

Beans Kitchen Musashiurawa opened

November 1

Shopping promenade Nonomichi opened between Musashi-Sakai Station and Higashi-Koganei Station on Chuo Line

October 1

Suica service partially introduced at three Agatsuma Line stations

September 4

Established JR Tomato Land Iwaki Farm Co., Ltd.

August 1

Monthly transactions of transportation e-money exceeded 110 million in July

July 16

CIAL Sakuragicho opened

July 1

Established the Structural Technology Center as an affiliated organization of the head office

June 24

Established the Shinagawa Large-Scale Development Department within the General Planning Headquarters

June 23

JR East View Travel Service Company Limited invests in Taiwanese travel agency Creative Travel (Taiwan), Ltd.

April 15

Established London Office (closed on March 31, 2025)

April 1

  • Iwaizumi Line discontinued and replaced by bus service
  • Fares and charges revised in connection with the consumption tax rate increase
  • Suica service partially introduced on 12 lines covering 33 stations in the Tokyo, Sendai, and Niigata areas

March 31

Niitsu Rolling Stock Manufacturing Factory closed (transferred to Japan Transport Engineering Company)

March 17

Swallow Service introduced on the Takasaki Line Limited Express Swallow Akagi

March 15

Series EV-E301 (ACCUM) begins operation on the Karasuyama Line

March 10

Launch of the JR East App service

March 7

NOMONO Akihabara opened

February 23

Keihin-Tohoku Line train derailed at Kawasaki Station

February 4

Group Safety Plan 2018 announced

February 2

Remote station control system introduced

January 27

nonowa Higashikoganei opened

January 1

Established the Policy Research Office within the head office

2013

November 7

The World Railway Museum Conference was held at the Railway Museum

November 6

Announced participation in the Bangkok Purple Line project in Thailand

November 3

Suicle bike-sharing service begins operations

October 29

Group Management Vision V: Status and update on priority initiatives announced

October 19

TOHOKU EMOTION begins operation

October 1

Shinjuku South Energy Service Co., Ltd. and DHC Shinjuku merged

September 20

Tōkyō Station Yaesu Exit GRANROOF completed

September 13

Opening of Kaihimmakuhari Station as an Ecoste (eco-station)

September 12

JR Otsuka South Exit Building opened

August 3

Odeca, a transportation IC card for BRT (Bus Rapid Transit System) launched

August 1

Monthly transactions of transportation e-money exceeded 100 million in July

July 12

Daily transactions of transportation e-money exceeded 4 million

June 22

Suica service begins in the SAPICA area, including Sapporo City Transportation Bureau

June 10

Established the Intellectual Property Center within the Technology Planning Department

May 29

nonowa Musashisakai WEST opened

April 8

JR-EAST HOTEL METS NIIGATA opened

April 1

  • Started outsourcing station operations at Musashi-Sakai Station on the Chuo Line to JR Chuo Line Mall Co., Ltd.
  • Established JR East Station Service Co., Ltd.
  • Hokuriku Sales Center opened in Kanazawa City, Ishikawa Prefecture

March 23

  • Suica service begins in Niigata Kotsu's Ryuto area
  • Nationwide mutual use service for 10 IC transit cards begins

March 16

  • New stop for the Shonan-Shinjuku Line at Urawa Station
  • Series E6 Super Komachi begins operation
  • Series E5 Hayabusa begins operation at 320 km/h, the fastest speed in Japan

March 15

Established Singapore Office (closed on March 31, 2025)

March 2

Ōfunato Line operated by BRT (Bus Rapid Transit System) begins operation

March 1

Cotonior Kichijoji, a combined facility for child-rearing support and elderly welfare, opened

February 1

Sister station agreement signed between Tōkyō Station and New York’s Grand Central Terminal

January 10

JR Kanda Manseibashi Building completed

2012

December 22

Kesennuma Line operated by BRT (Bus Rapid Transit System) begins full-scale operation

December 5

mobile Suica exceeds 3 million members

November 1

Established Brussels Office (closed on September 30, 2018)

October 30

“JR East Group Management Vision V (Five) – Ever Onward” announced

October 3

The Tokyo Station Hotel reopened after renovation

October 1

  • Free public Wi-Fi service launched for international visitors to Japan
  • Tokyo Station Gallery and Central Street opened
  • Tōkyō Station Marunouchi Building restoration and preservation completed

September 13

nonowa Nishikokubunji opened

August 20

Kesennuma Line operated by BRT (Bus Rapid Transit System) begins temporary operation

August 1

Vice Chairman Kiyono (at the time) assumed the position of Chairman of the International Union of Railways (UIC) (until December 2012)

July 13

Jexer Fitness & Spa Shinjuku opened

June 30

JR Minami-Shinjuku Building completed

June 28

  • Opening of Hiraizumi Station as an Ecoste (eco-station)
  • Gransta Marunouchizaka Area opened

May 1

Established the Reconstruction Planning Department within the General Planning Headquarters

April 26

Key issues and numerical targets for the next three years (FY2012-2013) announced

April 2

Acquired all shares of the company that succeeded Tokyu Car Corporation’s rolling stock manufacturing business through a company split from Tokyu Railways (now TOKYU CORPORATION ) and established it as a subsidiary, Japan Transport Engineering Company (J-TREC)

April 1

  • Merged the mechanical equipment divisions of three companies with JR East Mechatronics Co., Ltd., the rolling stock divisions were merged with East Japan Transport Technology Co., Ltd. and Niigata Rolling Stock Machinery Co., Ltd.
  • Reorganization of group companies related to rolling stock and mechanical equipment maintenance
  • Appointed Honorary Station Masters at unstaffed stations

March 30

Announcement made regarding the Iwaizumi Line being replaced by bus service

March 27

JR-EAST HOTEL METS UTSUNOMIYA opened

March 17

  • Yoshikawaminami Station on the Musashino Station opened
  • Hachinohe Line fully restored

March 14

Opening of Yotsuya Station as an Ecoste (eco-station)

January 20

NOMONO, a permanent store for the Regional Rediscovery Project opened

2011

December 9

A new system was introduced to more accurately assess wind forces on trains and regulate operations accordingly

December 1

JR Kanto Area Pass launched

November 16

Jexer Fitness & Spa Kameido opened

November 1

Established Japan International Consultants for Transportation Co., Ltd.

October 28

LUMINE Yurakucho opened

October 10

Senseki Line begins use of ATACS, a radio-based train control system

October 4

Trial of smartphone-based information service conducted on the Yamanote Line

October 1

  • Nippon Restaurant Enterprise Co., Ltd. merged with Delicious Link Co., Ltd.
  • Station Building Midori Co., Ltd. merged with Shinano Enterprise Co., Ltd.

September 23

  • ecute Akabane has fully opened
  • Tōhoku Shinkansen resumes normal operation

July 27

Major flood damage caused by heavy rain in Niigata and Fukushima prefectures (including the Tadami Line)

July 15

Established the Tourism Strategy Office within the General Planning Headquarters

July 9

Partial lifting of speed restrictions on the Tōhoku Shinkansen

June 24

Special Summer Timetable implemented in accordance with the government’s electricity usage restriction order

June 4

C61 steam locomotive resumes operations

May 16

ecute Shinagawa South opened

April 29

Tōhoku Shinkansen resumes operations along the entire line

April 1

  • The goal of doubling the number of childcare support facilities to 54 within three years of the GV2020 launch was achieved
  • Transferred part of the shopping center operations of Morioka Terminal Building Co., Ltd. to JR East Aomori Business-Development Company Co., Ltd.
  • JR East Aomori Business-Development Company Co., Ltd. merged with Hirosaki Station Building Co., Ltd.

March 31

ecute Ueno opened

March 20

Keiyo Street opened

March 11

Great East Japan Earthquake occurs

March 5

  • GranClass service launched
  • Tōhoku Shinkansen Hayabusa begins operation

2010

December 4

  • NorthCourt GRANSTA DINING, A-FACTORY, and Aomori Shunmikan opened
  • Tōhoku Shinkansen service begins between Hachinohe and Shin-Aomori Station

November 19

atre Akihabara 1 opened

November 7

Elevated section of the Chuo Line between Mitaka and Tachikawa completed

July 31

Train derailment occurs on the Iwaizumi Line

July 1

  • Established the Environmental Management Promotion Office in the Corporate Strategies Headquarters
  • Renamed the International Department to International Business Department and transferred the Overseas Railway Business Promotion Office to the new department

June 26

Platform doors installed at Ebisu Station on the Yamanote Line (installed at Meguro Station on August 28)

June 9

Resumed water intake at the Shinano River Power Station under the permit for Exclusive Use of River Water

April 30

Soradofarm Toda opened

April 19

Women-only cars introduced on Keihin-Tohoku Line and the Negishi Line

April 1

  • Part of the business of Ikebukuro Terminal Building Co., Ltd. is transferred to LUMINE Co., Ltd., which is then merged with JR East Building Co., Ltd.
  • Acquired management rights of Kinokuniya Co., Ltd.

March 28

SouthCourt ecute Tokyo opened

March 25

atre vie Sugamo opened

March 13

  • Launch of Suica service with Izukyu Corporation
  • Automatic charging service launched for mobile Suica
  • Mutual use of IC transit cards and e-money begins with JR Kyushu’s SUGOCA, Nishi-Nippon Railroad’s nimoca, and Fukuoka City Transportation Bureau’s Hayakaken
  • Three-way e-money interoperability begins with Suica, TOICA, and ICOCA
  • Musashi-Kosugi Station on the Yokosuka Line opened